Company *
|
Street Address
|
City / State / Zip
|
Contact Info (Name) *
|
Phone *
Fax
E-mail *
|
| B) Cleanroom Project Information |
1. Project Name
|
2. Street Address
|
City / State / Zip
|
Nearest Major City
|
Desired project completion date
|
| C) General Cleanroom Design Parameters |
1. Process to be performed in cleanroom
|
2. Select Desired Cleanliness Classification
|
3. Select Desired Airflow Direction
Unless otherwise instructed by your product / process specialist,
design will be based on vertical airflow projection |
4. Heat load generated by equipment in cleanroom (kW or BTU/hr)
|
5. Duty cycle of heat-producing equipment in cleanroom
|
6. Is any heat-producing equipment in cleanroom water cooled?
|
7. Average number of persons that will be working in the cleanroom
|
8. Are hazardous or flammable materials used in process?
|
9. Will the cleanroom have any fume hoods, or process
exhaust
requirements? If yes, please identify quantity (CFM)
CFM Exhaust:
|
| 10. Desired airlock / change room conditions: |
a. Temperature (Fahrenheit)
+/-
|
b. Relative Humidity (Minimum)
(Maximum)
|
c. Relative Pressure (in/W.C.)
|
| 11. Desired Cleanroom Conditions, Cleanroom #1: |
a. Temperature (Fahrenheit)
+/-
|
b. Relative Humidity (Minimum)
(Maximum)
|
c. Relative Pressure (in/W.C.)
|
| 12. Desired Cleanroom Conditions, Cleanroom #2: (if applicable) |
a. Temperature (Fahrenheit)
+/-
|
b. Relative Humidity (Minimum)
(Maximum)
|
c. Relative Pressure (in/W.C.)
|
13. Desired Lighting Level (typically 80/100 FC)
Photo Resist Yellow Light?
|
14. Are hazardous location light fixtures required?
|
15. If special light condition desired, please specify:
|
16. Lighting control preference:
|
| D) Room Details and Accessories |
| 1. Room Sizes |
a: Airlock / Change Room (width)
X (length)
X (ceiling height)
|
b: Cleanroom #1
(width)
X (length)
X (ceiling height)
|
b: Cleanroom #2
(width)
X (length)
X (ceiling height)
|
2. Additional Airlock between Change Room and Cleanroom?
|
a: Airlock #2
(width)
X (length)
X (ceiling height)
|
| 2. Doors (Standard finish on doors is Anodized Aluminum, custom finishes available on request) |
Standard 3' x 7' Doors
Quantity
If special size, please identify:
|
Motorized Sliding Doors
Quantity
If special size, please identify:
|
Double 6' x 7' Doors
Quantity
If special size, please identify:
|
| 3. Windows (Standard Windows are 36" x 36", clear safety glass) |
Quantity
Photo Resist Yellow Glass?
|
| 4. Pass-thru(s) (Standard Pass-thru cabinet is 20"W x 20"H x 20"D interior dimensions. Custom sizes are available) |
Quantity
Mechanically Interlocked Doors
Electrically Interlocked Doors (requires power source) |
Stainless Steel Finish
White Laminate Finish with Clear Polycarbonate Doors |
Please list any special features,
if any, required for pass-thru's
|
| 5. Wall finish color: Standard is easy-clean white aluminum. If other is desired, please specify below. |
|
6. Flooring preference:
|
|
| Please specify any other special flooring requirements below - if none, leave blank. |
|
| 7. Electrical power in cleanroom |
120V Duplex Receptacles
Quantity
Spaced every
Feet |
120V Quadplex Receptacles
Quantity
Spaced every
Feet |
220-230V Specialty Receptacles
Quantity
Specify Amperage:
|
480V Specialty Receptacles
Quantity
Specify Amperage:
|
Other: Please specify
|
| 7. Data / telecommunications in cleanroom |
Data / Ethernet connections
Quantity
|
Telephone connections
Quantity
|
Intercom connections
Quantity
|
Other: Please specify
|
| 8. Process or utility piping requirements in Cleanroom |
Compressed air
Quantity
Fitting Preference
|
Vacuum
Quantity
Fitting Preference
|
Nitrogen
Quantity
Fitting Preference
|
Argon
Quantity
Fitting Preference
|
Other
Quantity
Fitting Preference
|
Natural Gas, Please specify
quantity, size and flow requirements
|
Housekeeping Central Vacuum System (typically supplied with a single
25' hose, and quantity of connections to allow entire cleanroom to be reached ) Please list |
Please list any additional
piping requirements.
|
| 9. Controls |
Simple heat / cool thermostat
Stand-alone, economical control and monitor panel
Monitor panel only |
PC or Building automation system interface? (required)
|
What control system is
currently installed in building?
|
| 10. Safety (check all that apply) |
Building has existing fire sprinkler system |
Cleanroom will require fire sprinklers |
Fire alarm and/or pull stations required in cleanroom |
Fire alarm remote tie-in required |
Smoke detector remote tie-in required |
Please list any other safety systems
required (if none, leave blank)
|
| E) Site Information |
1. Project will be located on the
floor of
story building
feet from outside wall |
2.What is the clear height from floor to roof joists or other structural steel at cleanroom location?
|
3.What is the height of the roof joists?
|
4.What is the spacing between the roof joists?
|
5.What is the height to the roof or other remaining overhead obstructions?
|
6. Access to the cleanroom area from loading dock area is
|
7.How many feet from cleanroom area to loading area?
|
8.How wide are access hallways between cleanroom area and loading area?
|
9. A/C Equipment is / will be located on
|
10. Existing roof type
|
11. Are existing building area drawings available?
|
12. Is year round chilled water available?
If yes, at what temperature?
|
13. Is year round cooling tower water available?
|
14. Is year round boiler hot water available?
If yes, at what temperature?
|
15. Is year round steam available?
If yes, at what temperature?
|
16. Is there a city drain for A/C condensate located near the cleanroom?
|
| 17. Conditions in space surrounding cleanroom (inside building) |
Summer Temperature
Winter Temperature
|
Summer Humidity
Winter Humidity
|
| 18. Conditions outside building |
Summer Temperature
Winter Temperature
|
Summer Humidity
Winter Humidity
|
| 19. Electrical service available in building (check any / all that apply) |
460-480V (3-phase)
220-240V (3-phase)
120-208V (1-phase)
277V (1-phase) for lighting |
20. Is union labor required?
|
21. Please list any other site
conditions (if none, leave blank)
|
Attach a File:
|
Security Code:
|
| Please either attach, using the above attachment area and e-mail, or fax a sketch of the proposed cleanroom. One of our sales representatives will contact you regarding a price quote as soon as this cleanroom planning guide is received and reviewed. Thank You. |
|
| |